> Edit your post
title
of this thread
your
message
information seems particularly thorough. I note this section: Conditioning: Maintain an ambient temperature between 65 and 75 degrees Fahrenheit in spaces to receive wood products for at least seven days before installation, during installation, and for at least seven days after installation. After post-installation period, maintain relative humidity and ambient temperature planned for building occupants. Do not install wood products until it has adjusted to the relative humidity and temperature of the space where it is to be installed. Moisture contents between flooring/paneling and sub flooring should vary no more than 2-1/2% of one another before installation This is particularly important because the "tiles" (what thickness would you expect these to be ?) are very prone to swelling and shrinking in width and length -- more than traditional wood flooring. (That's the source of my comment about a leaky roof !)
associated web
images
(optional)
associated web
link
(optional)
your
email
your
password
create a forums account
|
you forgot your password?
An interactive place to share your questions and reflections about
modern & post-modern design.
advertising
DESIGNER FURNITURE
Contemporary Home the home of premium Italian Designer Furniture with great savings
Get all the info regarding
HOME APPLIANCES !
Stylish lined ready made
CURTAINS
by Terrys Fabrics